Daytime bridge work on the Spaulding Turnpike in Dover

posted on: 5/26/2020

The New Hampshire Department of Transportation (NHDOT) maintenance crews will make required repairs to the Spaulding Turnpike Bridge over NH 108 in Dover beginning on May 26, 2020.

The work will be done from 9 a.m. to 5 p.m. and is expected to be completed, weather permitting, on May 28, 2020.

During the day the Spaulding Turnpike southbound will be reduced to one lane at the Exit 7 interchange and the on ramp will be closed. NH 108 traffic seeking to enter the Spaulding Turnpike southbound ramp will be directed via signs and messages boards to use the Spaulding Turnpike northbound on ramp and reverse direction at Exit 8. Steel plates will be left in the travel way during off work hours.

Daytime bridge work on the Spaulding Turnpike in Dover

posted on: 5/26/2020

The New Hampshire Department of Transportation (NHDOT) maintenance crews will make required repairs to the Spaulding Turnpike Bridge over NH 108 in Dover beginning on May 26, 2020.

The work will be done from 9 a.m. to 5 p.m. and is expected to be completed, weather permitting, on May 28, 2020.

During the day the Spaulding Turnpike southbound will be reduced to one lane at the Exit 7 interchange and the on ramp will be closed. NH 108 traffic seeking to enter the Spaulding Turnpike southbound ramp will be directed via signs and messages boards to use the Spaulding Turnpike northbound on ramp and reverse direction at Exit 8. Steel plates will be left in the travel way during off work hours.

Motorists are advised to reduce speeds and follow signs, message boards, and traffic cones through the work zone.