Feasibility Study

In April 2014, a Joint Building Committee was formed to oversee a feasibility study exploring the new construction, renovation or rebuilding of Dover High School and the Career Tech Center.

In December 2014, HMFH Architects, Inc. was hired to undertake the feasibility study.

The feasibility study consists of several components, including an Existing Conditions Report, a Visioning Study, an Educational Space Program, an Options Investigation, and Options Analysis.

These components are explored in more detail on the pages listed on the left-hand column of this page.

Below is an information session about the study by the architectural firm.